Project Portfolio

Describe your project requirements and we will give you a free eBudget Estimate!

Client Testimonials

 

projects in your area

Nuclear Projects
Killona, Louisiana

Waterford Nuclear Generating Station: Bluegrass to design, fabricate and deploy special equipment and diamond wires to dry cut structural components to provide access to remove the Steam Generators during the Waterford 3 RVCH and Steam Generator Replacement Project.
Back to Top
Port Gibson, Mississippi

Grand Gulf Nuclear: Bluegrass technicians will cut an 8 ft x 10 ft opering in a 3 ft thick CMU wall for equipment access in the Radwaste building.
Back to Top
Sequoyah Nuclear Plant/TVA

Bluegrass will provide core drilling services in the support of SGRP N-1 outage scheduled for April 2011.
Back to Top
ARKANSAS NUCLEAR STATION
View
View
Click to view larger image

Two 120-ton condensers were split in half so that four 60-ton sections could be removed. The diamond wire cut through 27,000 inconel tubes, steel pipes, and steel baffle plates.
Back to Top
BIG ROCK POINT
View
View
View
Click to view larger image

Diamond wire sawed over 1,500 tons of highly activated and contaminated concrete surrounding the reactor vessel cavity to support the decommissioning.
Back to Top
Columbia Energy

Bluegrass designed, fabricated and performed full scale mockup testing of remote deployed and operated cutting system to cut and remove a portion of the tank roof for robotic deployment of tank cleaning system in support of Washington River Protection Solutions cleanup effort at the Hanford tank farm.
Back to Top
CY TEST CUTTING
View
View
View
Click to view larger image

Bluegrass diamond wire cut the carbon steel reactor nozzle mock-up. The nozzle was 55” in diameter with a 28” annulus.
Back to Top
DC COOK NUCLEAR
View
View
Click to view larger image

Bluegrass provided around-the-clock diamond wire cutting in support of SGRP. The entire 3’ thick roof sections, over four steam generators and enclosure walls, were diamond wire cut into 18, 15-ton sections and removed.
Back to Top
FIU
Click to view larger image

Bluegrass performed a technology demonstration of the Marcrist MSW300 Wall Concrete Shaver, mounted to a remotely operated Brokk 250, as part of the FIU-HCET technology assessment program. Six hundred feet of uncoated concrete walls, coated concrete ceilings and coated brick walls were removed at 1/4" depths.
Back to Top
GINNA
View
View
View
Click to view larger image

The steam generators were to be removed and replaced through the containment dome.  Bluegrass, using four robotic hammers around-the-clock, broke two large openings through the 3’ thick concrete with 3 layers of #18 rebar on 12” centers, while maintaining the integrity of the containment liner plate.
Back to Top
GRAND GULF NUCLEAR
Click to view larger image

Diamond wire sawing of a section of the AUX Building Rail Road Bay Concrete Wall; 17'x3'7"x1'4" thick; Diamond wire sawed 12" off the top of existing man-way.
Back to Top
Humboldt Bay

Bluegrass technicians will diamond wire saw concrete and metal cutting in support of the decommissioning of the Humboldt Bay Nuclear Power Plant.
Back to Top
HUMBOLDT PLANT
View
View
View
Click to view larger image

Bluegrass diamond wire cut a 250’ tall concrete ventilation stack located directly adjacent to the spent fuel storage area.  Bluegrass cut the stack into ring sections of specified length, while working from a moveable, elevated platform. All cooling water was contained and recycled during the cutting process due to contamination potential.
Back to Top
LACROSSE BOILING WATER REACTOR
View
View
View
Click to view larger image

Performed concrete and metal wire cutting for decommissioning.
Back to Top
PLUM BROOK STATION
View
View
View
Click to view larger image

Floor and Wall Shavers deployed by MOTA Corporation removed contaminated concrete to facilitate FSS operations during plant decommissioning.
Back to Top
SMUD
View
View
View
Click to view larger image

Diamond wire sawed in support of the Reactor Vessel Head Segmentation project as well as segmenting reactor head for transport.
Back to Top
SMUD Shaver
Click to view larger image

Bluegrass performed a technology demonstration of the Marcrist Diamond Floor Shaver and MWS300 Wall Shaver, at the Rancho Seco Nuclear Power Plant turbine building, as requested by the DOE and EPRI, and in conjunction with the National Energy Technology Laboratory (NETL) and several nuclear utility companies. The floor and remote controlled surface decontamination shaving systems shaved concrete at 1/8” to 1/4“ depths, producing a completely smooth, finished surface.
Back to Top
SPHERE ENCLOSURE BUILDING
View
View
View
Click to view larger image

Performend diamond wire sawing in support of decommissioning of Unit 1 for the demolition of the Sphere Enclosure Building.
Back to Top

Please click the links below for more details on these projects.

Contact us for an estimate.

nuclear