Diamond wire sawed copper furnace flameouts.
Performed test cutting of copper furnace flameouts.
The steam generators were to be removed and replaced through the containment dome. Bluegrass, using four robotic hammers around-the-clock, broke two large openings through the 3’ thick concrete with 3 layers of #18 rebar on 12” centers, while maintaining the integrity of the containment liner plate.
Diamond wire sawed debarker drum.
With a combination of down hole and wrap cutting technicians segmented miter gate recesses for the lock extension.
OCCI, Inc
LIFT GATE REPLACEMENT
Bluegrass technicians diamond wire sawed 4’ square by 56’ vertical section, which required drilling a battered 56’ deep wire access hole and cut 56’ by 4’ twice per six areas then horizontally cut six times to section for rigging to allow for new lift gate slot equipment and new concrete.
Floor and Wall Shavers deployed by MOTA Corporation removed contaminated concrete to facilitate FSS operations during plant decommissioning.
Please click the links below for more details on these projects.
Contact us for an estimate.