Project Portfolio

Describe your project requirements and we will give you a free eBudget Estimate!

 
SMUD
SMUD
Sacramento, California
BENICIA REFINERY
BENICIA REFINERY
Benicia, California
PIER T: CITY OF LONG BEACH
Covina, California
Projects in the South
ALABAMA ARMY AMMUNITION PLANT

Bluegrass technicians are using diamond wire saws, Brokk robotic hammers, core drills and flat saws for building modifications.
Back to Top
BRIDGE OF LIONS

Bluegrass technicians will diamond wire saw existing bridge pier to mud line.  Some columns are as big as eighteen feet in diameter with sheet piling.
Back to Top
CHICKAMAUGA

Bluegrass has been contracted to re-cut the slot in Chickamauga Dam.  Total square feet of concrete to be cut is approximatley five thousand feet.
Back to Top
ABC NUCOR STEEL
View
View
View
Click to view larger image

Diamond wire sawed in support of steel mill refurbishing.
Back to Top
BALFOUR BEATTY
View
View
View
Click to view larger image

Cut bridge caisson's 60' underwater.
Back to Top
BRIDGE OF LIONS
View
View
View
Click to view larger image

Provided personnel and equipment to diamond wire saw fourteen piers and two bascules.
Back to Top
BUCKMAN'S BRIDGE
Click to view larger image

Diamond wire sawed footer sections for bridge expansion retrofits.
Back to Top
CLEARWATER BRIDGE
View
View
View
Click to view larger image

Performed segmentation of bridge columns for removal.
Back to Top
CY TEST CUTTING
View
View
View
Click to view larger image

Bluegrass diamond wire cut the carbon steel reactor nozzle mock-up. The nozzle was 55” in diameter with a 28” annulus.
Back to Top
FIU
Click to view larger image

Bluegrass performed a technology demonstration of the Marcrist MSW300 Wall Concrete Shaver, mounted to a remotely operated Brokk 250, as part of the FIU-HCET technology assessment program. Six hundred feet of uncoated concrete walls, coated concrete ceilings and coated brick walls were removed at 1/4" depths.
Back to Top
GRAND GULF NUCLEAR
Click to view larger image

Diamond wire sawing of a section of the AUX Building Rail Road Bay Concrete Wall; 17'x3'7"x1'4" thick; Diamond wire sawed 12" off the top of existing man-way.
Back to Top
HOLT DAM
View
View
View
Click to view larger image

Turnkey removal of discharge ring for turbine and generator upgrade. Provided diamond wire sawing, robotic hammering, and core drilling for concrete removal.
Back to Top
KENTUCKY DAM POWER HOUSE
View
View
View
Click to view larger image

Diamond wire sawed slot for floating mooring bit.
Back to Top
LUCITE
View
View
View
Click to view larger image

Cut and removed 2 end risers from a steel boiler plate which were 11' diameter and 5" thick with a refractory lining 10 inches thick.
Back to Top
SALUDA DAM
View
View
View
Click to view larger image

Dimaond wire sawed 40" hexagons on the riser piers, core drilled over 600 holes for utilization of expansive grout, and Brokked the 1,000 yards of concrete to a rubble.
Back to Top
SOUTHDOWN
View
View
View
Click to view larger image

Diamond wire sawed 3 motor support pedestals flush, 1 compressor foundation flush, and 3' x3' vertical cut to isolate the conduit block from the I-D foundation.
Back to Top
TALLULAH FALLS DAM
View
View
View
Click to view larger image

Removed a concrete section from a plug cut for a pipe insert.
Back to Top

Please click the links below for more details on these projects.

Contact us for an estimate.

south