Bluegrass technicians are diamond wire sawing twenty feet by two feet riser blocks during train traffic, which reduces track time for replacement.
WILLIAMS BROTHERS/TEXAS DOT
Bluegrass technicians are wire sawing two hammerhead caps at an elevation of seventy feet. Four vertical cuts, two per cap are forty-nine square feet with twenty-two #14 bars and fifteen #8 bars. There will be four cuts on the columns, which are fifty-six square feet each that have fifty-four #18 bars each. The remaining straddle bent requires two vertical cuts sixty square feet each and consists of forty-four #14 bars each and twelve #11 bars. The two seven feet diameter columns (34.5 sq/ft) will be cut once under cap. Total cutting is estimated at six hundred seventy-seven square feet.
Two 120-ton condensers were split in half so that four 60-ton sections could be removed. The diamond wire cut through 27,000 inconel tubes, steel pipes, and steel baffle plates.
Wiresawed 14 piers and drilled nearly 300 core holes for anchor bolts, removing 121 cubic yards of concrete.
Performed diamond wire sawing to segment (2) 6' diameter piers in less than an hour on a railroad bridge.
Used Brokk robotic hammer to demolish 2, 68' diameter digester lids.
Diamond wire sawed track beams including sole plates during plant shut down.
Pierce Elevated Bridge- Diamond wire sawed 100s of columns in downtown Houston for new bridge utilizing 3-4 saws dialy.
Diamond wire sawed three pairs of concrete slots into the lock walls so that stoplogs could be installed in the slots.
Segmentation of lid by diamond wire saw for modifications to existing tank.
Cored drilled bridge caisson fifty feet deep at four inches in diameter for the Audubon Bridge Project.
For complete bridge project details visit: http://www.timedla.com/bridge/audubon/
dismantle upper structure of stadium for removations
Bluegrass technicians used four robotic hammers around the clock to demolish six feet by twenty-six feet diameter area that consisted of concrete, granite blocks, and brick from the railroad bridge turnstile pier for installation of new support system.
Read more about the project at ENR.com:
http://enr.construction.com/news/transportation/archives/071107b.asp
Stadium renovations.
Bluegrass technicians demolished the existing stage in The Southern Theatre with robotic hammers to be replaced with an upgraded hydraulic drop stage.
Please click the links below for more details on these projects.
Contact us for an estimate.

























