"This project was a stepping stone for OCCI, Inc. and Bluegrass to build a relationship for the future. It is OCCI's intention to partner with Bluegrass for years to come! Since completion of this project, OCCI has been awarded a similar project at another lock and has partnered with BBC to complete the concrete demolition. BBC was chosen for this project due to their innovative approach to the demolition as well as their team approach to the entire job which allowed for overall project success."
- Doug Kolb, Project Manager, OCCI, Inc.
SPHERE ENCLOSURE BUILDING
SPHERE ENCLOSURE BUILDING
San Clemente, California
BENICIA REFINERY
BENICIA REFINERY
Benicia, California
SMUD
SMUD
Sacramento, California
Underwater Metal Cutting
Offshore_25_m.jpg
End_Conductor_Offshore_LG_m.jpg
Offshore_30_m.jpg

Bluegrass’ offshore effort was a natural migration given our experience in the nuclear industry, heavy steel cutting of reactor nozzles, marine cutting of crane pintles, and cruise ship crank shafts.  We have developed a patented family of saws which are attached to drill rig legs, casings, etc. by diver or ROVs.   Robustly engineered with  mission sensitive design Bluegrass saws allow easy deployment, predictable cut rates, and minimal dive time.

Our familiy of saws have brought to the offshore market consistant performance resulting in predictable cut rates and substantially reduced vessel and diver time previously devoted to underwater cutting.  Our robust design and ease of deployment have resulted in innovative solutions reducing what had been an adventure to routine.

Contractor: WildWell / BTI / Mactech
Offshore Cutter: Bluegrass
Gulf of Mexico

Working from a DP vessel, Bluegrass technicians made multiple cuts on thirty-three inch diameter cans at an average depth of eighty-five feet.   Average cut time was one and a half hours per cut with each cut requiring the use of a single wire.

Contractor: WildWell / BTI / Mactech
Offshore Cutter: Bluegrass
Gulf of Mexico

While aboard an offshore platform, Bluegrass technicians competed multiple cuts at an average depth of one hundred twenty five feet.  Each cut required the use of a single wire. 
Quantiy   Dimensions of Cut   Type
18            33 inches                  Conductor
18            22 inches                  Conductor
6              16 inches                  Conductor
4              44 inches                  Conductor
1              52 inches                  Leg
1              44 inches                  Pipe Leg
1              35 inches                  Pipe
 
Contractor: WildWell / BTI / Mactech
Offshore Cutter: Bluegrass
Gulf of Mexico

Bluegrass technicians made a series of cuts including a twenty inch double wall leg in forty-five minutes and a thirty-three inch well head cut.  The diamond wire sawing was completed at an average depth of one hundred thirty feet with each cut requiring the use of a single wire.

Contractor: WildWell / BTI / Mactech
Offshore Cutter: Bluegrass
Gulf of Mexico

Bluegrass offshore technicians have completed over eleven, twenty-four inch well heads cuts at an average depth of eighty-five feet.